Files
73

What you upload. Files are the raw material — run a job against one to turn it into a table or a tile.

Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)

Built 5 hours ago
Fire run for the simulation "Elk Creek FPD", from Simulations.
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Assets reached

Built 5 hours ago
Every asset the fire reached, with the minute and the clock time it did. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Burning edge by time

Built 5 hours ago
The part of the fire's edge still burning at each time step: next to ground the front reached within the step or not yet in the black (worked out in DuckDB from the arrival and cooled tables). An edge stopped by a treatment drops out once it cools. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Damage per structure (estimate)

Built 5 hours ago
Each structure the fire reached, classed on the DINS field scale (Destroyed, Major, Minor, Affected) from how it burned: house to house, flame length, or only reached. A screening estimate, not an assessment. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Debris flows (projected)

Built 5 hours ago
Projected post-fire debris-flow channels (USGS pfdf on the simulated burn), one row per channel per design storm: `storm` (peak 15-minute rainfall, mm/h), `likelihood` (Staley 2017 M1), `volume` in cubic metres (Gartner 2014) and `hazard` 1-3 (Cannon 2010). Filter on `storm` to pick one. A projection from fire behaviour, not a mapped burn. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Debris-flow basins (projected)

Built 5 hours ago
The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Evacuation zones

Built 5 hours ago
Each evacuation zone as Order (the fire within about half a mile in the next hour), Warning (within about two miles in the next three hours) or not at risk, with the minute it became each. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Fire pathways

Built 5 hours ago
The main routes the fire took: its arrival time read like a DEM, each cell stepping back to the neighbour the fire came from, and the ways most of the burned area ran through kept. `use` counts the burned cells whose way back runs through a piece and `share` is that over all of them: the higher, the more the fire ran that way. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Perimeters by time

Built 5 hours ago
The fire's extent at each time step of the run, one polygon per step, cumulative. Filter on `hours` or `clockTime` to pick one perimeter. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Roads cut off

Built 5 hours ago
Roads that lose every way out of the simulated area, and while: walked as a network in DuckDB at each time step, with burning roads closed and roads in the black open again. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Roads reached

Built 5 hours ago
Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Smoke (screening estimate)

Built 5 hours ago
Ground-level PM2.5 from the fire, by the hour, as areas in each EPA AQI category above Good (`class` 1 Moderate to 5 Hazardous; `val`/`valTo` the µg/m³ range; `hour` since ignition). A Gaussian plume screening estimate, not a forecast. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Treatment edges, held or breached

Built 5 hours ago
Each treatment's edge where the fire reached it: `status` held (the fire came within a cell and stopped) or breached (it burned across, on both sides of the edge), `treatment` its index in the run and `name`, `minutes` when the fire first came near. Worked out in DuckDB from the run's burned area. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Thinning — Watersheds after the fire

Built 5 hours ago
Each debris-flow basin: the share burned and at moderate or high severity, and its highest debris-flow likelihood, hazard and volume over the design storms. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Thinning (2026-11-10 16:56)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)

Built 5 hours ago
Fire run for the simulation "Elk Creek FPD", from Simulations.
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Assets reached

Built 5 hours ago
Every asset the fire reached, with the minute and the clock time it did. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Burning edge by time

Built 5 hours ago
The part of the fire's edge still burning at each time step: next to ground the front reached within the step or not yet in the black (worked out in DuckDB from the arrival and cooled tables). An edge stopped by a treatment drops out once it cools. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Burning homes by time

Built 5 hours ago
Homes lit house to house (not by the wildland fire itself), drawn as the fire's ground: each time band's homes with their yards, neighbors within about 30 m joined into one shape (grown and shrunk in DuckDB). One ring per band, `minutes` its end and `homes` how many it lit. Shown only: the run's acres stay the wildland's. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Damage per structure (estimate)

Built 5 hours ago
Each structure the fire reached, classed on the DINS field scale (Destroyed, Major, Minor, Affected) from how it burned: house to house, flame length, or only reached. A screening estimate, not an assessment. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Debris flows (projected)

Built 5 hours ago
Projected post-fire debris-flow channels (USGS pfdf on the simulated burn), one row per channel per design storm: `storm` (peak 15-minute rainfall, mm/h), `likelihood` (Staley 2017 M1), `volume` in cubic metres (Gartner 2014) and `hazard` 1-3 (Cannon 2010). Filter on `storm` to pick one. A projection from fire behaviour, not a mapped burn. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Debris-flow basins (projected)

Built 5 hours ago
The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Evacuation zones

Built 5 hours ago
Each evacuation zone as Order (the fire within about half a mile in the next hour), Warning (within about two miles in the next three hours) or not at risk, with the minute it became each. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Fire pathways

Built 5 hours ago
The main routes the fire took: its arrival time read like a DEM, each cell stepping back to the neighbour the fire came from, and the ways most of the burned area ran through kept. `use` counts the burned cells whose way back runs through a piece and `share` is that over all of them: the higher, the more the fire ran that way. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Perimeters by time

Built 5 hours ago
The fire's extent at each time step of the run, one polygon per step, cumulative. Filter on `hours` or `clockTime` to pick one perimeter. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Roads cut off

Built 5 hours ago
Roads that lose every way out of the simulated area, and while: walked as a network in DuckDB at each time step, with burning roads closed and roads in the black open again. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Roads reached

Built 5 hours ago
Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Smoke (screening estimate)

Built 5 hours ago
Ground-level PM2.5 from the fire, by the hour, as areas in each EPA AQI category above Good (`class` 1 Moderate to 5 Hazardous; `val`/`valTo` the µg/m³ range; `hour` since ignition). A Gaussian plume screening estimate, not a forecast. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Treatment edges, held or breached

Built 5 hours ago
Each treatment's edge where the fire reached it: `status` held (the fire came within a cell and stopped) or breached (it burned across, on both sides of the edge), `treatment` its index in the run and `name`, `minutes` when the fire first came near. Worked out in DuckDB from the run's burned area. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: Conifer December 19th 2025 with Treatments — Watersheds after the fire

Built 5 hours ago
Each debris-flow basin: the share burned and at moderate or high severity, and its highest debris-flow likelihood, hazard and volume over the design storms. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Conifer December 19th 2025 with Treatments (2026-11-10 17:07)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)

Built 5 hours ago
Fire run for the simulation "Elk Creek FPD", from Simulations.
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Assets reached

Built 5 hours ago
Every asset the fire reached, with the minute and the clock time it did. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Burning edge by time

Built 5 hours ago
The part of the fire's edge still burning at each time step: next to ground the front reached within the step or not yet in the black (worked out in DuckDB from the arrival and cooled tables). An edge stopped by a treatment drops out once it cools. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Burning homes by time

Built 5 hours ago
Homes lit house to house (not by the wildland fire itself), drawn as the fire's ground: each time band's homes with their yards, neighbors within about 30 m joined into one shape (grown and shrunk in DuckDB). One ring per band, `minutes` its end and `homes` how many it lit. Shown only: the run's acres stay the wildland's. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Damage per structure (estimate)

Built 5 hours ago
Each structure the fire reached, classed on the DINS field scale (Destroyed, Major, Minor, Affected) from how it burned: house to house, flame length, or only reached. A screening estimate, not an assessment. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Debris flows (projected)

Built 5 hours ago
Projected post-fire debris-flow channels (USGS pfdf on the simulated burn), one row per channel per design storm: `storm` (peak 15-minute rainfall, mm/h), `likelihood` (Staley 2017 M1), `volume` in cubic metres (Gartner 2014) and `hazard` 1-3 (Cannon 2010). Filter on `storm` to pick one. A projection from fire behaviour, not a mapped burn. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Debris-flow basins (projected)

Built 5 hours ago
The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Evacuation zones

Built 5 hours ago
Each evacuation zone as Order (the fire within about half a mile in the next hour), Warning (within about two miles in the next three hours) or not at risk, with the minute it became each. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Fire pathways

Built 5 hours ago
The main routes the fire took: its arrival time read like a DEM, each cell stepping back to the neighbour the fire came from, and the ways most of the burned area ran through kept. `use` counts the burned cells whose way back runs through a piece and `share` is that over all of them: the higher, the more the fire ran that way. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Perimeters by time

Built 5 hours ago
The fire's extent at each time step of the run, one polygon per step, cumulative. Filter on `hours` or `clockTime` to pick one perimeter. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Roads cut off

Built 5 hours ago
Roads that lose every way out of the simulated area, and while: walked as a network in DuckDB at each time step, with burning roads closed and roads in the black open again. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Roads reached

Built 5 hours ago
Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Smoke (screening estimate)

Built 5 hours ago
Ground-level PM2.5 from the fire, by the hour, as areas in each EPA AQI category above Good (`class` 1 Moderate to 5 Hazardous; `val`/`valTo` the µg/m³ range; `hour` since ignition). A Gaussian plume screening estimate, not a forecast. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: December 19th 2025 — Watersheds after the fire

Built 5 hours ago
Each debris-flow basin: the share burned and at moderate or high severity, and its highest debris-flow likelihood, hazard and volume over the design storms. Written by each run of the fire simulation whose output file is "Elk Creek FPD: December 19th 2025 (2026-11-10 16:46)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:50)

Needs upload
Fire run for the simulation "Elk Creek FPD", from Simulations.
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)

Built 5 hours ago
Fire run for the simulation "Elk Creek FPD", from Simulations.
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)

Built 4 hours ago
Fire run for the simulation "Elk Creek FPD", from Simulations.
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Assets reached

Built 4 hours ago
Every asset the fire reached, with the minute and the clock time it did. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Burning edge by time

Built 4 hours ago
The part of the fire's edge still burning at each time step: next to ground the front reached within the step or not yet in the black (worked out in DuckDB from the arrival and cooled tables). An edge stopped by a treatment drops out once it cools. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Burning homes by time

Built 4 hours ago
Homes lit house to house (not by the wildland fire itself), drawn as the fire's ground: each time band's homes with their yards, neighbors within about 30 m joined into one shape (grown and shrunk in DuckDB). One ring per band, `minutes` its end and `homes` how many it lit. Shown only: the run's acres stay the wildland's. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Damage per structure (estimate)

Built 4 hours ago
Each structure the fire reached, classed on the DINS field scale (Destroyed, Major, Minor, Affected) from how it burned: house to house, flame length, or only reached. A screening estimate, not an assessment. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Debris flows (projected)

Built 4 hours ago
Projected post-fire debris-flow channels (USGS pfdf on the simulated burn), one row per channel per design storm: `storm` (peak 15-minute rainfall, mm/h), `likelihood` (Staley 2017 M1), `volume` in cubic metres (Gartner 2014) and `hazard` 1-3 (Cannon 2010). Filter on `storm` to pick one. A projection from fire behaviour, not a mapped burn. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Debris-flow basins (projected)

Built 4 hours ago
The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Evacuation zones

Built 4 hours ago
Each evacuation zone as Order (the fire within about half a mile in the next hour), Warning (within about two miles in the next three hours) or not at risk, with the minute it became each. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Perimeters by time

Built 4 hours ago
The fire's extent at each time step of the run, one polygon per step, cumulative. Filter on `hours` or `clockTime` to pick one perimeter. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Roads cut off

Built 4 hours ago
Roads that lose every way out of the simulated area, and while: walked as a network in DuckDB at each time step, with burning roads closed and roads in the black open again. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Roads reached

Built 4 hours ago
Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Smoke (screening estimate)

Built 4 hours ago
Ground-level PM2.5 from the fire, by the hour, as areas in each EPA AQI category above Good (`class` 1 Moderate to 5 Hazardous; `val`/`valTo` the µg/m³ range; `hour` since ignition). A Gaussian plume screening estimate, not a forecast. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Treatment edges, held or breached

Built 4 hours ago
Each treatment's edge where the fire reached it: `status` held (the fire came within a cell and stopped) or breached (it burned across, on both sides of the edge), `treatment` its index in the run and `name`, `minutes` when the fire first came near. Worked out in DuckDB from the run's burned area. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Watersheds after the fire

Built 4 hours ago
Each debris-flow basin: the share burned and at moderate or high severity, and its highest debris-flow likelihood, hazard and volume over the design storms. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".
v0
4 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Assets reached

Built 5 hours ago
Every asset the fire reached, with the minute and the clock time it did. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Burning edge by time

Built 5 hours ago
The part of the fire's edge still burning at each time step: next to ground the front reached within the step or not yet in the black (worked out in DuckDB from the arrival and cooled tables). An edge stopped by a treatment drops out once it cools. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Burning homes by time

Built 5 hours ago
Homes lit house to house (not by the wildland fire itself), drawn as the fire's ground: each time band's homes with their yards, neighbors within about 30 m joined into one shape (grown and shrunk in DuckDB). One ring per band, `minutes` its end and `homes` how many it lit. Shown only: the run's acres stay the wildland's. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Damage per structure (estimate)

Built 5 hours ago
Each structure the fire reached, classed on the DINS field scale (Destroyed, Major, Minor, Affected) from how it burned: house to house, flame length, or only reached. A screening estimate, not an assessment. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Debris flows (projected)

Built 5 hours ago
Projected post-fire debris-flow channels (USGS pfdf on the simulated burn), one row per channel per design storm: `storm` (peak 15-minute rainfall, mm/h), `likelihood` (Staley 2017 M1), `volume` in cubic metres (Gartner 2014) and `hazard` 1-3 (Cannon 2010). Filter on `storm` to pick one. A projection from fire behaviour, not a mapped burn. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Debris-flow basins (projected)

Built 5 hours ago
The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Evacuation zones

Built 5 hours ago
Each evacuation zone as Order (the fire within about half a mile in the next hour), Warning (within about two miles in the next three hours) or not at risk, with the minute it became each. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Perimeters by time

Built 5 hours ago
The fire's extent at each time step of the run, one polygon per step, cumulative. Filter on `hours` or `clockTime` to pick one perimeter. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Roads cut off

Built 5 hours ago
Roads that lose every way out of the simulated area, and while: walked as a network in DuckDB at each time step, with burning roads closed and roads in the black open again. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Roads reached

Built 5 hours ago
Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Smoke (screening estimate)

Built 5 hours ago
Ground-level PM2.5 from the fire, by the hour, as areas in each EPA AQI category above Good (`class` 1 Moderate to 5 Hazardous; `val`/`valTo` the µg/m³ range; `hour` since ignition). A Gaussian plume screening estimate, not a forecast. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

Elk Creek FPD: Pine Junction December 19th 2025 — Watersheds after the fire

Built 5 hours ago
Each debris-flow basin: the share burned and at moderate or high severity, and its highest debris-flow likelihood, hazard and volume over the design storms. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 (2026-11-10 16:52)".
v0
5 hours ago

ElkCreekAOI.zip

v0
5 hours ago

tl_2026_08059_roads.zip

v0
5 hours ago
Bintel