Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Debris-flow basins (projected)

v0 · … · built 5 hours ago

The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".

Details

What you upload. Files are the raw material — run a job against one to turn it into a table or a tile.

Name

Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Debris-flow basins (projected)

ID

01f0239d-30c3-418f-bc20-74e49189e52c

Description

The outlet basins of the projected debris-flow channels, one row per basin per design storm, with the outlet channel's likelihood, volume and hazard and the outlet's `outletLon`/`outletLat`. Filter on `storm` to pick one. Written by each run of the fire simulation whose output file is "Elk Creek FPD: Pine Junction December 19th 2025 with Treatment (2026-11-10 17:28)".

Latest version

v0

Size
Created

4 hours ago by Thomas Marsh

Last edited

4 hours ago by Thomas Marsh

Versions

Each upload of this file is a version. Jobs run against a specific one, so older versions are kept.

Jobs
1

Jobs turn this file into something the map can draw — a parquet table, or GeoTIFF tiles.

Schedules
0

Re-run a job on a timer, for data that changes at the source — a nightly feed, a weekly extract.

Bintel
Fire Simulations: Files - Elk Creek FPD: Pine Junction December 19th 2025 with Treatment — Debris-flow basins (projected)