Miller Canyon: Run 2 — Roads reached

v0 · … · built 2 weeks ago

Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Miller Canyon: Run 2 (2026-10-20 20:53)".

Details

What you upload. Files are the raw material — run a job against one to turn it into a table or a tile.

Name

Miller Canyon: Run 2 — Roads reached

ID

b956fcb1-97c9-4289-9350-7fc48ff485db

Description

Every stretch of road the fire reached, cut where it crosses each time step, with the minute and clock time it was cut. Worked out in DuckDB from the arrival table. Written by each run of the fire simulation whose output file is "Miller Canyon: Run 2 (2026-10-20 20:53)".

Latest version

v0

Size
Created

2 weeks ago by rachelle.wilson@bintel.io

Last edited

2 weeks ago by rachelle.wilson@bintel.io

Versions

Each upload of this file is a version. Jobs run against a specific one, so older versions are kept.

Jobs
1

Jobs turn this file into something the map can draw — a parquet table, or GeoTIFF tiles.

File to Table(s)

Complete
2026-10-20 20:56 · rachelle.wilson@bintel.io
Schedules
0

Re-run a job on a timer, for data that changes at the source — a nightly feed, a weekly extract.

Bintel
Fire Behavior: Files - Miller Canyon: Run 2 — Roads reached